360 Degree Consulting Support

  • Boiler & turbine commissioning (PF, FBC & CFBC)
  • Boiler & turbine operational management (light up and synchronization- PF, FBC & CFBC)
  • Causes of and solution of HT equipment’s breakdown.
  • To improve Boiler combustion, higher LOI and boiler efficiency.
  • To improve plant efficiency, turbine heat rate, and Cooling tower performance.
  • To improve water chemistry parameters.
  • To reduce unit tripping of the power plant.
  • To reduce boiler tube failure.
  • To improve ESP performance.
  • To improve ESP field failure.
  • To improve ash conveying.
  • Turbine overhauling.
  • Generator overhauling
  • Electrical interlock and protection.